information infrastructure evaluation

US. Sports Fanatics has a very simple paper-based system and no information infrastructure that is easy to use. So an installation of information infrastructure will help U.S. Sports Fanatics a lot. However, before it can do so, a thorough evaluation has to be completed. The evaluation has to be done along with an analysis of the current information bank, even though it is paper-based. U.S. Sports Fanatics is looking forward to automated information that is readily accessible at all times. The need for CIA (confidentiality, integrity, and availability) matches the line of business that U. S. Sports Fanatics has going for it.

Assignment

One of the first tasks in the development of an enterprise system architecture manual is to evaluate the enterprise information infrastructure and system architecture and processes. The enterprise information infrastructure and systems processes consist of the data and how they are collected, managed, and stored throughout their life cycle.

Tasks to be completed before adding the new content for Week 2:

  • Update the Enterprise System Architecture Definition document title page with the new date.
  • Update the previously completed sections based on your instructor’s feedback.

Week 2: Information Infrastructure Evaluation

For this assignment, you will conduct an in-depth evaluation of the enterprise systems infrastructure and content management processes in your selected organization. If the organization already has an enterprise content management system and formal content management procedures in place, you will document the existing system and procedures. If there are currently no formal system or systems architecture procedures in place, you will document the informal parts of the system that exist.

The project deliverables are as follows:

  • Week 2: Information Infrastructure Evaluation
    • Content List
      • Provide a categorized list of the online sales used for the major organizational processes.
    • Enterprise Systems Tools
      • Document the tools that are used to capture, manage, store, preserve, and deliver the content.
    • Enterprise Systems Processes
      • Document the processes’ flow technology through the infrastructure.
  • Be sure to update your table of contents before submission.
  • Name the document “yourname_CS663_IP2.doc.”

Worked Example

Please refer to the Worked Example that follows for an example of this assignment based on the Problem-Based Learning Scenario. The worked example is not intended to be a complete example of the assignment, but it will illustrate the basic concepts that are required for completion of the assignment, and it can be used as a general guideline for your own project. Your assignment submission should be more detailed and specific and should reflect your own approach to the assignment rather than just following the same outline provided in the worked example.

Note that the worked example includes material from previous worked examples. The new material will be found under the Week 2 sections of the Table of Contents.

The worked example is provided here to help with this assignment.





ORDER YOUR ORIGINAL PAPER

Request for a custom paper or place a new order

Assignment Solutions For You


THE BEST CUSTOM ESSAY WRITING SERVICE AT YOUR FINGERTIPS

Forget All Your Assignment & Essay Related Worries By Simply Filling Order Form